[email protected] Supplying Australia, New Zealand & the Pacific Islands
Warehouse medium duty storage shelving installations and project references
Proven Engineering Deployments

Medium Duty Storage Shelving Projects

Engineered longspan & medium-duty industrial shelving installations by Guangzhou Heda Shelves Co., Ltd., built for commercial hubs and high-throughput warehouses across Oceania.

Real World Installations

Medium Duty Storage Shelving Project References

Explore how our customized boltless medium-duty shelving and longspan configurations solve complex carton handling, parts distribution, and general industrial storage challenges.

Medium duty shelving system for general storage warehouse General Storage
Sep 2026 • Commercial Hub

Medium Duty Shelving for General Storage Warehouse

Complete warehouse fit-out utilizing multi-tier modular beam profiles and heavy-duty steel shelf decking. Engineered to accommodate high SKU diversity with fast manual picking aisles and adjustable level pitches.

Load Capacity: 300–500 kg / level
Shelf Material: Solid Steel Panels
Assembly: 50mm Pitch Boltless
Coating: Epoxy Powder Coat
Auto parts high density medium shelving installation Automotive Logistics
Aug 2026 • Distribution Centre

Multi-Tier Medium Shelving System for Auto Spare Parts

Integrated mezzanine-supported medium duty longspan racks designed to maximize vertical ceiling clearance. Features organized shelf dividers, bin fronts, and anti-drop wire mesh cladding for high-density carton pick faces.

Load Capacity: 400 kg / shelf
Configuration: 2-Tier Walkway
Protection: Column End Guards
Finish: Industrial Blue / Orange
Chemical packaged goods storage shelving project Industrial & Retail
Jul 2026 • Trade Warehouse

Hardware & Building Supply Longspan Shelving System

Reinforced stepped-beam medium duty rack designed for boxed hardware and awkward packaged stock. Accommodates direct hand-loading with durable galvanized or powder-coated finishes suited for rigorous commercial environments.

Load Capacity: 600 kg / level
Shelf Decking: Flush Wire Mesh
Safety: Positive Beam Locks
Standard: Certified High-Tensile Steel

200 - 800 kg / Level

Precisely engineered cold-formed step beams calibrated for uniform distributed loads (UDL).

50mm Height Adjustability

Boltless teardrop or butterfly punch hole profiles permit quick reconfiguration without specialized tooling.

AS 4084 Referenced

Structural calculation reports and engineering certification dossiers prepared for council or regulatory sign-off.

Durable Pre-Treatment

Automated pickling, phosphating, and electrostatic powder coating assure corrosion resistance.

Verified Quality & On-Site Delivery

Client Project Galleries & Warehouse Verification

Inspect real warehouse handovers, installation progress, and on-site fitouts delivered by Guangzhou Heda Shelves Co., Ltd.

Ready to Engineer Your Medium Duty Shelving Project?

Send your warehouse dimensions, beam span requirements, or SKU details. Guangzhou Heda Shelves Co., Ltd. provides free 2D/3D CAD layout planning and structural quotes within 24 hours.

Contact Us