[email protected] Supplying Australia, New Zealand & the Pacific Islands

CE / ISO Certified Gravity Carton Flow Rack Flow Through Racks Roller Storage Racking With Plastic Box Bin

Product Description

Carton Flow Rack System
Dynamic Storage Rack

Carton Flow Rack (Dynamic Rack)

Carton flow rack is also called dynamic rack, which makes it efficient to have the product flow through the stocking aisle to the picking aisle. Carton flow rack is a high density, dynamic storage system that increases flexibility and maintains the First-In / First-Out product flow from the stocking aisle to the picking aisle, increasing efficiency.

The items being stored are loaded in the rear and rolled down to the front where they are picked up. The inclined front offers optimum visibility and access to the containers, which allows easy retrieval of more bulky merchandise with short storage time.

The roller tracks are used in a number of combinations, depending on the carton sizes, the quality of the carton and the weight. The roller beds are developed to allow a maximum flexibility in the positioning of the tracks, and they can be laid at a very small pitch.

Structural Features

Structural feature illustration
1. Gravity Feeding Design

Putting the goods on the wheel. One side for loading, the other side for picking. The picking side of the rack is lower than the loading side, allowing goods to automatically slide forward.

2. First-In / First-Out

Guaranteed first-in first-out storage solution, ensuring high turnover management and product freshness.

3. High Storage Efficiency

One-time loading supports multiple picking cycles, greatly maximizing storage density and warehouse throughput.

4. Wide Application

Ideal for short-dated storage and large-quantity picking work. Widely used in logistics centers, assembly workshops, and high-frequency turnover warehouses.

5. Load Capacity

Standard loading capacity ranges between 100~2000 kg/layer to match varied storage demands.

Carton Flow Rack System View
Dynamic Rack Layout Diagram
Roller Shelf Structure

Technical Specifications

Roller Track Components
Product Name Roller Shelf, Warehouse Roller Rack System, Gravity Flow Rack
Material Cold-rolled Steel Q235
Size Customized, depend on customer requirements
Color Customized (RAL SYSTEM)
Capacity 300-5000 kg/layer (can be customized)
Surface Treatment Powder coated
Feature Anti-rust & Corrosion protection
Package Knock down packed by cartons with air bubble foam
Usage Warehouse Rack
Advantage Save space and save labor cost
Lead Time 10-15 days
Shipping By sea
Payment L/C, T/T etc.

Product Gallery & Installation Display

Carton Flow Showcase
Warehouse Racks Installation
Flow Rack Detail
Industrial Storage Rack
Roller Bed Components
Gravity Racking Setup
Warehouse Flow Racking System
Storage Flow Rails
Rack Structure Parts
Assembled Flow Rack
Loading View
Picking Lane Configuration
Carton Flow Testing
Warehouse Operation
Multi-Tier Flow Racks
High Density Racks
Rack Production Workshop
Factory Facility
Factory Storage Site

Frequently Asked Questions

Q1 Are you a factory or trading company? Where are you located?

We are a factory specializing in all kinds of warehouse storage racks. Our factory is located in Nanjing City, Jiangsu Province, China. You can fly to Nanjing Airport directly, and you are warmly welcome to visit us whenever you are available.

Q2 What raw material is used for your racking products?

The primary raw material steel code is Q235 cold-rolled steel. Other steel grades are also available based on customer requirements.

Q3 What are your accepted terms of payment and delivery times?

Payment terms including T/T, L/C, and Western Union are available. In general, delivery is within 15 days after deposit.

Q4 May I know the production status of my order?

Yes. We send project updates and photos at different production stages of your order, ensuring you receive the latest information in time.

Q5 How do you guarantee product quality?

We have professional engineers to check and verify the profile dimensions needed to guarantee your specific load weight requirements. Before shipping, our quality control team rigorously checks whether the quality is approved.

Q6 How do we install the carton flow rack system?

We provide detailed installation drawings to guide rack assembly. If needed, we can also send an engineer to provide on-site installation guidance, while related travel expenses (flight, lodging, meals) will be at customer expense.

Related Products