[email protected] Supplying Australia, New Zealand & the Pacific Islands

Heavy Duty Mezzanine Floor Racking Warehouse Storage Racks Shelf Units Pallet Rack System Equipment Platform Shelves Attic Rack

Product Description

Product Description
Mezzanine Floor systems are also referred to as steel platform shelves. It mainly consists of upright, main beams, secondary beams, floor panels, stairs, and guardrails. Complete assembly without on-site welding. According to different load requirements, different material specifications are selected for design, with strong overall rigidity and wide applicability.
Mezzanine Floor System Overview
Steel Platform Structure
Specification
Product name Metal Shelf
Country of origin China
Use Storage
Colour Customizable
Material Steel
Peculiarity Corrosion Protection
Certification CE
Free Sample Available (Delivery Cost on Buyer)
OEM Available
Excellent delivery time The delivery time will be within 10-15 working days after received deposit
Load-bearing 200-1000kg/ square meter
You can also send us the drawings of your warehouse then our designer will make a placement plan for you for FREE!!
Company Profile
Dongguan Caiyun Intelligent Storage Technology Co., Ltd. is a professional company specializing in production, design, sales, construction, storage shelf equipment and logistics equipment, covering an area of 15000 square meters. The company has more than 100 designers and operators, the main products include light and medium shelves, heavy shelves, crossbeam shelves, drive-in shelves, fluent shelves, Cantilever shelves, integrated shelves, attic shelves, mold shelves, chrome-plated shelves, gourd hole shelves, high quality and low price, fast production speed, after-sale guarantee.
Dongguan Caiyun Intelligent Storage Facility
Product Display
Product Display View 1
Product Display View 2
Product Display View 3
Product Display View 4
Product Display View 5
Details Images
Detailed Component View 1
Detailed Component View 2
Our Advantages
Advantage Feature 1
Advantage Feature 2
Advantage Feature 3
Frequently Asked Questions
Q What components are included in this mezzanine floor system?
The system mainly consists of upright columns, main beams, secondary beams, floor panels, stairs, and safety guardrails.
Q Is on-site welding required during assembly?
No on-site welding is required. The entire structure is designed for complete bolted assembly, ensuring quick, safe, and clean on-site installation.
Q What is the standard load-bearing capacity?
The mezzanine platform supports between 200kg and 1000kg per square meter, customized according to your specific storage requirements.
Q Can I get a customized warehouse layout design?
Yes. You can send us your warehouse drawings or dimensions, and our engineering team will provide a tailored placement plan free of charge.
Q What is the production and delivery lead time?
The standard production and delivery time is within 10 to 15 working days following the receipt of your deposit.
Q Are free samples and OEM services available?
Yes, OEM service is fully supported, and free samples are available with the delivery cost covered by the buyer.

Related Products