High-performance structural modules certified under European CE and international safety standards. Built for demanding high-bay logistics, heavy industrial storage, and high-density distribution centers.
Founded in 2001 in Guangzhou, China, Guangzhou Heda Shelves Co., Ltd. operates a state-of-the-art 30,000 m² production facility backed by more than 300 technical engineers, robotic roll-forming lines, and comprehensive CE & ISO 9001 certifications.
Our 300+ engineering and technical staff deploy advanced finite element analysis (FEA) to calculate baseplate bearing pressures, frame Euler buckling limits, and second-order P-Delta structural effects under full static and seismic load spectrums.
Equipped with continuous automated multi-station cold roll-forming lines, 3D CNC laser cutting arrays, robotic submerged-arc welding clusters, and two fully enclosed pre-treatment electrostatic powder coating tunnels running 24/7.
Fully certified under European CE Construction Products Regulation (Certificate No. 2435-CPR-8605159) and ISO 9001:2015 (No. 18624Q00169R0M). Every shipment is accompanied by mill test certificates (MTC) conforming to EN 10204 3.1.
From prime steel coils to zero-defect crating, our in-house manufacturing process ensures dimensional tolerances within ±0.5mm across all upright column profiles and beam connectors.
Step 01
Step 02
Step 03
Step 04
Step 05
Step 06
Step 07
Step 08
Step 09
Step 10
Selecting the proper industrial rack configuration requires balancing SKU selectivity against volumetric storage density, forklift cycle speeds, and structural deflection coefficients (δ ≤ L/200 under AS 4084 / EN 15512).
| Racking Typology | Yield Strength | Pallet Selectivity | Storage Density | Floor Utilization | Max Dynamic Bay Load | Standard Compliance |
|---|---|---|---|---|---|---|
| Selective Pallet Racking | Q235B / Q355B | 100% Direct | Baseline (Moderate) | 35% – 40% | Up to 24,000 kg | EN 15512, AS 4084, RMI |
| Drive-In / Drive-Thru | Q235B Cold-Formed | LIFO / FIFO (Batch) | Ultra High (+75%) | 65% – 75% | Up to 25,000 kg | EN 15620, AS 4084-2023 |
| Radio Shuttle Automation | Q355B High-Tensile | High Semi-Auto | Maximum (+85%) | 70% – 80% | Up to 30,000 kg | Machinery Dir. 2006/42/EC |
| Push-Back Racking | Q235B / SS400 | LIFO (2-6 Deep) | High (+55%) | 55% – 65% | Up to 18,000 kg | FEM 10.2.02, EN 15512 |
| Heavy Duty Cantilever | Hot-Rolled H-Section | 100% (Long Goods) | Configurable | 45% – 55% | Up to 5,000 kg/Arm | EN 1993-1-1 (Eurocode 3) |
| Multi-Tier Mezzanine | Q235B + C/Z Purlins | 100% Manual/Trolley | Multi-Level (+100%) | 80% – 95% | 300 – 1,200 kg/m² | AS/NZS 1170, EN 1993 |
For seismic-rated warehouse installations across Australia, New Zealand, and seismically active European zones, HEDA Shelves utilizes micro-alloyed Q355B cold-rolled steel with a guaranteed minimum yield strength ($f_y$) of 355 MPa and ultimate tensile strength ($f_u$) of 470–630 MPa. Cold roll-forming introduces strain hardening around the profile corners, increasing the effective yield point by 8% to 15% across column flanges.
Warehouse automation, strict seismic regulations, and sustainability requirements are reshaping industrial storage procurement worldwide. Here are the five engineering shifts governing next-generation logistics centers.
Traditional manual tolerances (±3.0mm) cause system jams with Automated Guided Vehicles (AGVs) and Autonomous Mobile Robots (AMRs). Future procurement specifications enforce EN 15620 Class 100/200 tolerances (±1.0mm) on rail alignment, beam level deflection, and rack plumbness.
Prescriptive static racking designs are increasingly rejected by structural certifiers. B2B buyers now mandate site-specific response spectrum analysis (RSA) following AS/NZS 1170.5 and Eurocode 8, incorporating nonlinear baseplate ductility and inter-story drift limits under full live loads.
To combat aggressive condensation in pharmaceutical cold storage (-30°C) and tropical maritime coastal facilities, procurement is pivoting toward continuous hot-dip pre-galvanized coils (Z275/Z350) coupled with thermosetting zero-VOC TGIC-free polyester powder coatings.
Industrial racks are transforming into connected sensor networks. Enterprise facilities are piloting embedded tri-axial accelerometers and piezoelectric strain gauges that log forklift impact energy in real-time, instantly notifying safety officers before progressive structural collapse occurs.
Procurement teams no longer accept flat 2D DWG drawings. Today’s contracts demand Level of Development (LOD) 350 to 400 BIM components in IFC/Revit formats, detailing every upright footplate anchor, sprinkler flue clearance, and structural clash with overhead MEP infrastructure.
Eliminating intermediary traders saves 18% to 28% on capital expenditure while securing direct access to our 300+ technical staff, custom die extrusion tooling, and factory-certified structural warranty documentation.
Guangzhou Heda Shelves operates under verified, unannounced third-party auditing regimes. Our CE marking and ISO management certifications are fully published with audit register credentials for direct customs and engineering validation.
Clear, technical answers to critical engineering, compliance, logistics, and quality assurance questions raised by supply chain executives and warehouse project managers.
Our CE certification for steel static storage systems complies strictly with EN 15512:2020. Testing includes stub-column compression tests to determine gross and effective cross-sectional area ($A_{eff}$), beam connector shear and bending moment tests to establish connection stiffness ($C_i$) and design moment resistance ($M_{Rd}$), and floor baseplate friction/bearing assessments. All mechanical destructive testing is conducted on hydraulic servo-controlled test beds with full stress-strain logging.
Yes. Our structural engineering department regularly prepares calculation packs referencing AS 4084 (Steel storage racking). We supply complete structural section properties, second-order elastic analysis calculations, beam deflection limits ($L/200$), and seismic load data suited for Australian certified structural engineers (CPEng/RPEQ) to execute local sign-off, producer statements, and Safe Working Load (SWL) signage.
We purchase prime hot-rolled and cold-rolled steel coils exclusively from premier Tier-1 state steel groups (such as Baosteel, Shougang, and Ansteel). Every coil delivery arrives with 3.1 Mill Test Certificates verifying Carbon (C ≤ 0.20%), Manganese, Silicon, Phosphorus, and Sulfur thresholds alongside Charpy V-notch impact values. In-house optical emission spectrometry (OES) randomly audits batches before slitting and roll-forming.
Under EN 15512 and FEM 10.2.02 codes, partial safety factors for actions are set at $\gamma_G = 1.4$ for permanent structural dead loads and $\gamma_Q = 1.4$ for variable pallet live loads. The material partial safety factor for cold-formed steel yield capacity is $\gamma_M = 1.1$. This ensures that any catalog load rating (e.g., 4,000kg per beam pair) maintains an ultimate failure threshold exceeding 1.54 to 1.65 times the nominal working rating under uniform distributed loading (UDL).
Beams and uprights are securely strapped onto custom heavy-gauge steel channel stillages or fumigated ISPM-15 certified timbers to comply with strict DAFF (Australia) and MPI (New Zealand) biosecurity protocols. Upright frames are separated by high-density polyethylene interleaving foam, wrapped in multi-layer water-resistant vapor barrier film, and secured with heavy-duty polyester strapping to eliminate metal-on-metal abrasion during long-haul container transit.
A 50-container (approx. 1,200 to 1,500 metric tons) heavy-duty selective or drive-in racking contract requires roughly 25 to 35 calendar days for raw material procurement, cold-roll fabrication, powder coating, and final CMM quality control. Sea freight transit from Nansha or Yantian port to major European ports (Rotterdam, Hamburg) takes approximately 28–35 days; to major Australian ports (Sydney, Melbourne, Brisbane), transit is typically 14–21 days.
Send our structural engineering department your warehouse floor plan and operating parameters. We deliver an optimized 3D CAD proposal, bill of materials (BOM), and certified load calculation within 24 hours.