[email protected] Supplying Australia, New Zealand & the Pacific Islands

First in First Out Gravity Flow Lane Aluminum FIFO Rack Rail System for Warehouse Picking

Product Description

FIFO Monorail Rail Product Overview

Product Description

FIFO Monorail System Structure

FIFO Monorail Rails are simple, gravity-fed track systems used in warehouses for efficient "First-In, First-Out" (FIFO) stock rotation, guiding carts or dollies along a single rail to ensure older stock is used first, streamlining material flow and preventing obsolescence.

These rails, often made of aluminum with steel running surfaces, feature grooves for mounting accessories and can be extended and anchored, simplifying logistics for handling items like rolls or containers.

Specification

Technical Specifications and Dimensions
Material Flow Designed for one-sided guidance, allowing wheeled carts or dollies (for specific wheel widths like 40mm or 55mm) to move smoothly.
Gravity-Fed Items are loaded at the high end and roll down by gravity to the low end, naturally implementing FIFO.
Modular Design Rails come in sections (e.g., 1200mm, 2400mm) that connect with strips, allowing for customized lengths.
Versatile Mounting Can be anchored to the floor or integrated with posts using mounting sets, with slots for attaching signage, enclosures, or brakes.
Monorail Track Detail A
Monorail Track Detail B
Accessory Component 1
Accessory Component 2
Accessory Component 3

Applications

  • Warehouse Logistics: Ideal for managing inventory that needs strict rotation, such as food, pharmaceuticals, or manufacturing components.
  • Workstation Setup: Used in assembly or picking stations to feed parts in sequence, reducing search time and improving efficiency.

Package and Delivery

Packaging and Shipment
Packaging: Wooden Case
Delivery Time: 7-15 days, within 30 days. (According to the quantity)

Company Introduction

Sanhok Facility

With history of from the year of 2002, Sanhok group has 230+ employees in China (Among them, 47+ engineers are with 20+ years related industry experience, 23+ engineers are with 20+ years related industry experience). Sanhok branches are in Guangzhou, Dongguan, Foshan.

Its main products including conveyor, home appliances assembly line like tv assembly line, air conditioner assembly line, washing machine assembly line, mobile phone assembly line, led lamp assembly line etc, accessories like lean pipe joint system, convey roller, roller rail, aluminum, hollow plate, working table. It is mainly used in household appliance industry, lithium battery industry, warehousing and logistics industry, bathroom industry, electronic industry, LED lamp industry, catering industry, logistics equipment industry.

Sanhok products with huge quantity are selling to China and overseas including South East Asia, Middle East Europe, Africa, North America and South America. We sincerely hope that friends from all over the world will become our loyal partners and forge ahead.

Workshop Equipment
Production Line Showcase

Frequently Asked Questions

What materials are used for this product?
This product is primarily made of carbon steel or stainless steel, with standard profiles featuring aluminum structures combined with durable steel running surfaces.
Where can this product be applied?
It is versatile and can be implemented in assembly lines, warehouses, conveyor systems, and dedicated picking workstations across multiple manufacturing sectors.
What are the available lengths and wheel size compatibility?
The system features a modular design with sections standardly available in lengths such as 1200mm and 2400mm (connectable via joint strips), designed to guide carts with 40mm or 55mm wheel widths.
How does the gravity-fed FIFO mechanism operate?
Carts or dollies are loaded onto the slightly elevated high end and gently glide down along the single rail by gravity to the discharge end, ensuring older components are utilized before newer ones.
What are the standard packaging and shipping schedules?
All products are packed securely in standard wooden cases. Typical delivery lead times range from 7 to 15 days, guaranteed within 30 days depending on final order quantity.

Related Products