1 / 5
| Item | Value |
|---|---|
| Material | Steel |
| Feature | Corrosion Protection |
| Weight Capacity | 500kg |
| Place of Origin | China |
| Type | Boltless / Rivet Shelving |
| Layer | 5 Layer, 1 Layer, 2 Layer, 3 Layer, 4 Layer |
| Surface Treatment | Powder Coated |
A: Generally, we pack our goods in carton boxes and plastic bubble film.
A: T/T 40% as deposit, and 60% before delivery. We'll show you the photos of the products and packages before you pay the balance.
A: EXW, FOB, CFR, CIF.
A: Generally, it will take 15 to 25 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
A: Yes, we have 100% test before delivery.